Where Tradition & Innovation Converge
Installation Guide
for Cleanroom Wall
System featuring
with trim-free seams
Vue de la page 0
1 2 3 4 5 6 ... 11 12

Résumé du contenu

Page 1 - Installation Guide

Where Tradition & Innovation Converge Installation Guidefor Cleanroom Wall System featuringwith trim-free seams

Page 2 - General Information

Seams Around Doors and window Frames and Other Special Application Areas1. Repeat process listed in Vertical Flat Panel Seams.2. Material should be

Page 3 - Installation Preparation

AN IMPORTANT NOTE ABOUT MOISTURE RESISTANT SUBSTRATESMOISTURE-RESISTANT GYPSUM VARIES TREMENDOUSLY, WHILE SOME OF THESE NEW SURFACES ALLOW MOISTURE TO

Page 4 - Choose an Adhesive

Form #7616 | Rev. 03 | 07.14 (7052)www.CleanroomWallPanels.com | [email protected]

Page 5 - Basic FRP Installation Steps

Figure 1TopicsGeneral Information 2Installation Preparation 3Pre-Installation Planning 5Basic FRP Installation Steps 5Cutting Inst

Page 6 - Attaching to Wall

Supplies and EquipmentSupplies will vary depending on wall substrate and adhesive choice• Crane Composites Standard FRP • Adhesive - Crane Advanced P

Page 7 - Seam Sealant Application

NEW GYPSUM BOARD OR DRYWALLNew gypsum should not be painted or primed. Tapered joints need only a fi ll and taped coating using a setting joint compou

Page 8 - Vertical Flat Panel Seams

ADHESIVE RECOMMENDATIONS FOR VARIOUS SUBSTRATESRefer to form #6846 for additional Crane Adhesive installation information.Pre-Installation Planning• P

Page 9 - Vertical Inside Corners

Cutting InstructionsPOSITION PANEL FACE DOWN ON A COVERED WORK AREAWhen cutting with a circular saw, position the panel so that the saw blade enters t

Page 10 - Seam Sealant Cleaning

Panel and Seam Sealant SequenceAll panels are installed prior to the seam treatment. Before caulk and sealant can be applied, installed panels need t

Page 11

Seam Sealant Workability Time1/8” - 3/16” Bead IMPORTANT INSTALLATION NOTE Seam Sealant workability begins at initial dispenseApply Ur

Page 12

7. Remove horizontal tape and begin next 3’ section. A good technique is to apply the sealant below the previous section and “bump up” the sealant i